Week 1 (Feb. 4 - 9):
“Procure” the necessary programs/hardware:
a. Adobe Flash (For scripting/animation)
b. Adobe Photoshop (For creating scenes/characters)
c. Computer (To specs. Listed in BoM)
d. Scanner
e. Sound Recorder/Playback
f. Audacity
Week 2 (Feb. 12 - 17):
• Import Photoshop files into Flash,
• Use imported files to create animated sequences.
• Use Audacity to record music/dialogue
Week 3 (Feb. 20 - 25):
• Import Photoshop files into Flash,
• Use imported files to create animated sequences.
• Use Audacity to record music/dialogue
Week 4 (Feb. 28 – March 4)
• Import Photoshop files into Flash,
• Use imported files to create animated sequences.
• Use Audacity to record music/dialogue
Week 5 (March 7 - 12):
Compile scripting/animation sequences into playable game
Week 6 (March 15 - 20):
• Use Testing Procedure to gauge appeal/functionality of game. Repeat above steps until project is completed to specifications as outlined in Selection/Rejection Report.
• Mentor contacts
• Solution Assessment
Week 7 (March 23 - 28)
• Use Testing Procedure to gauge appeal/functionality of game. Repeat above steps until project is completed to specifications as outlined in Selection/Rejection Report.
Week 8 (March 31 – April 5)
• Presentations. Marking period ends this week.
Friday, February 1, 2008
Subscribe to:
Post Comments (Atom)
16 comments:
Calendar posted...
I continued my construction process. Doing most of my animating at home. Not much to do in school...
I'm still constructing. Most of my work is at home. I need a PC version of flash to be productive during Systems Class.
Animation in progress. I'd say I'm over 30% dome with the project. Hope to bring something in later this week.
I'm still going. I'll get done eventually...
I submitted a "trailer" for my game. There's no sound though so I haven't been able to sho it. Oh, well, no big loss...
I was able to show my trailer in full. It looked decent, and was met with reasonable reviews. I'm awesome, I really am.
I'm still in the design process... last night I recorded some audio files to be used in the final game.
The process is continuing. I've been in contact with my mentor to determine whether or not everything is going as planned.
Yesterday I submitted my Press Release. My project by in large is going well, and I should accomplish much over the long break. Hopefully it will be ready for Beta Testing by the middle of April.
Still Progressing....
As of april 5, I'm preparing for my formal Progress Update. I have completed a trailer that will be shown along with it.
Completing Poster, game si being finalized. Testing by next week...
Yesterday, my game was completed. It will be submitted for testing and evaluation on Thursday June 12.
Post a Comment